Breaking: TransCanada Keystone I Pipeline Shut Down Indefinitely Due to Safety Concerns

authordefault
on

Following a string of oil spills, TransCanadaโ€™s Keystone I tar sands oil pipeline has been indefinitely shut down, and banned from restarting operations. Today, the Pipelines and Hazerdous Materials Safety Administrationย (PHMSA)ย issued a Corrective Action Order, which stops use of the pipeline until the regulator determines that safety problems have beenย corrected.

In the order, Jeffrey Wiese, associate administrator for pipeline safety at the Department of Transportation,ย wrote:ย 

I find that the continued operation of the pipeline without corrective measures would be hazardous to life, property and the environment. Additionally, after considering the circumstances surrounding the May 7 and May 29, 2011 failures, the proximity of the pipeline to populated areas, water bodies, public roadways and high consequence areas, the hazardous nature of the product the pipeline transports, the ongoing investigation to determine the cause of the failures, and the potential for the conditions causing the failures to be present elsewhere on the pipeline, I find that a failure to issue this Order expeditiously to require immediate corrective action would result in likely serious harm to life, property, and theย environment.

The Keystone I pipeline has spilled 12 times since beginning operation less than one year ago. Late last year, TransCanada had to dig up portions of the pipeline when abnormalities were discovered. ย 

Experts have raised concerns that tar sands oil pipelines pose serious safety risks due to the corrosive, acidic quality of tar sands oil, which is also pumped at higher temperatures and pressures than conventionalย oil.

This is a major blow for TransCanada, who is seeking approval from the State Department to construct the Keystone XL pipeline.ย The $13 billionย Keystone XL pipelineย would significantly increase the Canadian export of of dirty tar sands bitumen to the U.S. by as much asย 510,000 barrels a day.ย This project would pump crude from Canada to refineries in Texas, crossing the Ogallala Aquifer, Americaโ€™s largest aquifer and a source of drinking water for two millionย people.

As required by the Corrective Action Order, TransCanada submitted a restart plan which will be thoroughly reviewed by theย US Department of Transportationย PHMSA to ensure that TransCanada has satisfied all requirements needed to ensure safety of theย line.

Image credit:ย Celsias.

Related Posts

on

Canadian environmentalist Tzeporah Berman makes the case for a "bold idea" to end the era of coal, oil and gas.

Canadian environmentalist Tzeporah Berman makes the case for a "bold idea" to end the era of coal, oil and gas.
on

High demand for wild-caught species to feed farmed salmon and other fish is taking nutritious food away from low-income communities in the Global South.

High demand for wild-caught species to feed farmed salmon and other fish is taking nutritious food away from low-income communities in the Global South.
Analysis
on

Premier Danielle Smith can expect new tariffs, fewer revenue streams, and a provincial deficit brought on by lowered oil prices.

Premier Danielle Smith can expect new tariffs, fewer revenue streams, and a provincial deficit brought on by lowered oil prices.
on

Jeremy Clarkson spreads well-worn conspiracy theory that casts inheritance farm tax policy as plot to โ€œreplace farmers with migrantsโ€.

Jeremy Clarkson spreads well-worn conspiracy theory that casts inheritance farm tax policy as plot to โ€œreplace farmers with migrantsโ€.